Climate

Record drought on the Po in Cremona: 8.59 metres below the hydrometric zero

Il fiume Po in secca a Torino  dove si sono formati degli isolotti per la drastica diminuzione della portata dovuta alla prolungata siccità. Torino 30 luglio 2026 ANSA/TINO ROMANO - Turin, July 30, 2026 ANSA/TINO ROMANO ANSA

2' min read

Translated by AI
Versione italiana

2' min read

Translated by AI
Versione italiana

“The River Po is in a situation never seen before: in Cremona, it has even surpassed the record low set during the 2022 drought. The River Basin Authority has declared a high level of water stress across the entire district, and in the Delta the flow rate is now below the threshold required to prevent the intrusion of salt water from the sea. These are not alarmist claims from ‘climate fanatics’, but official figures. This means closed irrigation intakes, crops at risk, land damaged by salt and possible difficulties even with regard to drinking water.” This was stated on 3 August 2026 by M5S Senator Elena Sironi.

On 31 July in Cremona, the lowest negative level was recorded, dropping to eight metres and 59 centimetres below the hydrometric zero.

Loading...

“And yet,” she continued, “the Meloni government continues to treat the climate crisis as an ideological fabrication. The PNRR had allocated 357 million for 56 projects to renaturalise the River Po, which are essential for restoring space to the river and making the area more resilient to droughts and floods. According to the WWF, only 13 of these have been completed, using around 200 million. We need the immediate release of water from hydroelectric reservoirs and the completion of the structural works.”

Of particular note is an article dated 2 August 2026 from CremonaSera on drought affecting the River Po.

Lombardy: Region allocates 56.5 million for a new road bridge between Ostiglia and Revere

A new road bridge over the River Po between Ostiglia and Revere to make connections between the two banks of the Mantua area safer and more efficient. The Lombardy Regional Executive, following a proposal by the Councillor for Infrastructure and Public Works, Claudia Maria Terzi, has approved the draft agreement with ANAS for the construction of the new road deck along State Road 12 ‘dell’Abetone e del Brennero’.

The project, funded by the Region to the tune of €56.5 million through the 2021–2027 Development and Cohesion Fund (FSC), will see the disused railway bridge – which will be partially demolished – replaced with a new road link. Meanwhile, the existing road bridge will be refurbished and converted into a cycle and pedestrian path.

“This measure,” emphasises Councillor Terzi, “will improve the flow of traffic along State Road 12, a vital artery for residents, businesses and freight transport. In addition, the existing road bridge will be refurbished and converted for use by pedestrians and cyclists.”

Copyright reserved ©
Loading...

Brand connect

Loading...

Newsletter

Notizie e approfondimenti sugli avvenimenti politici, economici e finanziari.

Iscriviti